Already ripping up track. I had to do some rerouting so that I could get rid of the liftgate. I hated it. It kept falling down and that made the rails get out of alignment. The bridge will stay and be used for a gravel road instead, which is good because I wasn't sure how I was gonna route the road. Turns our all of this is much better. The track that was on it will be rerouted in the other direction (that's it in the back) to go around the mountain and connect with the upper track line. Now the train will make two complete loops around the layout before it completes a route.
2022-0-23 0:00
Keine Kommentare